
[管理] 工作分解結構
Prepare the work breakdown structure.
準備工作分解結構。
D lack of a clear work breakdown structure.
缺少一個清晰的工作分解結構。
RMC also supports different presentations for processes, such as work breakdown structure or workflow presentations.
RMC還支持不同的過程表示,比如工作分解結構或工作流表示。
Figure 17 shows a typical Timesheet view that displays work assignments by project, the work breakdown structure and corresponding data for each task assignment.
圖17顯示了一個典型的工時單視圖,展示了計劃好的工作分配情況、工作分解結構和每個任務分派相應的數據。
Defines and tracks project plan and work breakdown structure.
定義并追蹤項目計劃與工作分解結構。
The creation of demand comes from the requirements, statement of work, and by estimating the effort by the work breakdown structure (WBS).
需求的創建來自于需要,工作狀态,以及對工作分解結構(WBS)中的工作的估計。
Which of the following BEST describes how a work breakdown structure can be used to determine resources?
下列哪項能最佳地描述如何使用工作分解結構來确定資源?。
Instead, we'd have to base our progress tracking on work breakdown structure (WBS) items and on estimates to complete (ETCs) versus actuals.
相反,我們必須根據工作分解結構(WBS)項和我們的進展來估計實際完成的比例。
D. Lack of a clear work breakdown structure.
缺乏清晰的工作分解結構。
Based on our prior experience with such projects, we have developed a work breakdown structure.
基于我們以前從事類似項目的經驗,我們已經制訂了一個工作分解結構圖。
A work breakdown structure (WBS) is the best way to understand the detailed work of a project when you have to build a schedule from scratch.
當你需要從草稿中拟定出日程表時,工作分解結構 (WBS)是理解項目工作細節的最好方式。
First of all, the paper uses Work Load Point assessment system, work breakdown structure and critical path method to build the control and monitor system based on the Work Load Point system.
首先,本文運用工作負荷點系統的評估系統、項目分解結構以及關鍵路線法構建了基于工作負荷點系統的進度度量監控體系。
With WBS (work breakdown structure) method, distribute the objective to controllable work package.
利用WBS結構,将目标分解到可以控制的工作包中。
These may be within the context of a particular project, proposal or work breakdown structure element
這些可能在一個特定項目、提議或工作分解結構元素的上下文環境中。
For example, a formal work breakdown structure, schedule network, earned value analysis, change control process and so on.
舉例來說,一個正式的工作分解結構,進度網絡,掙值分析,改變控制過程等。
Introducing the concept of WBS (Work Breakdown Structure) into the project quotation software will greatly improve the accuracy of project cost estimation and the efficiency of cost control.
将項目管理中的WBS(工作分解結構)概念引入到工程報價軟件中,将大大提高工程造價計價的準确性和造價控制的效率。
The key parts of the SPP module are work breakdown structure (WBS) and the software estimation.
其中的重點是工作分解(WBS)和軟件項目估計。
For the third step in the creation of the capability patterns and delivery processes, a work breakdown structure (WBS) is created.
對于能力模式和交付過程的創建中的第三步,會生成一個工作分解結構(work breakdown structure,WBS)。
Software designers can author and publish their process as a process Web site or export it to IBM Rational Portfolio Manager as a work breakdown structure.
軟件設計人員可以創造并把他們的過程作為一個過程網站發布,或者作為一個工作分解結構輸出到IBMRationalPortfolioManager 。
Our collection of roles and responsibilities can serve as input to your work breakdown structure.
我們彙集的角色與職責可以用于您的工作分解結構(work breakdown structure)。
Tom Mochal offers some practical advice to save you time and rework on your next work breakdown structure.
TomMochal提供了5點實踐性的建議,下次進行工作分解結構設計時,你可以拿來參考節省時間。
See also work package, control account, contract work breakdown structure, and project summary work breakdown structure.
另外請見工作細目、控制帳目、合同工作分解結構和項目概括性工作分解結構。
Drafting a work breakdown structure (WBS) as the basis for a project schedule
草拟以項目計劃為基礎的工作故障結構(WBS)
A work breakdown structure (WBS) is defined.
定義工作分解結構(WBS)。
The article utilize the work breakdown structure (WBS) to the construction project progress goal determination;
本文将工作分解結構(WBS)運用到了施工項目進度目标的确定;
A work breakdown structure (WBS) is defined. This is a list of tasks that, if performed, will generate all of the work products needed to build the software.
定義工作分解結構(WBS)。這是一張任務列表。如果這些任務得到執行,将會産出工作産品,而這些工作産品是形成軟件所必須的。
The application of Work Breakdown Structure (WBS) in aero - engine model development was introduced The innovation and benefit on the application WBS in engineering were analyzed.
介紹了工作分解結構(WBS)在航空發動機型號研制中的應用,描述了WBS的創新點,并分析了WBS的工程應用價值。
It includes a Work Breakdown Structure illustrated with activity diagrams.
它包括使用活動圖進行說明的工作分解結構。
To understand the complexity of the requirement, you need to create its work breakdown structure (WBS).
要理解需求的複雜性,您需要創建它的工作崩潰結構 (WBS)。
工作分解結構(Work Breakdown Structure,WBS)是項目管理中的核心工具,用于将複雜項目逐層分解為可管理的組成部分。根據國際項目管理協會(PMI)發布的《項目管理知識體系指南》(PMBOK),WBS被定義為“以可交付成果為導向的層級分解框架”,其核心目标是将項目範圍、成本和資源分配可視化。
WBS的典型結構呈現為樹狀圖或列表形式,包含三個關鍵層級:
美國國家航空航天局(NASA)在《系統工程手冊》中強調,有效的WBS需滿足“100%原則”,即每個父級元素必須完全涵蓋其子級元素的工作内容,确保無遺漏重疊。例如在航天器研發項目中,WBS會将“熱控系統”分解為熱分析、材料測試、安裝驗證等可量化任務。
該工具的應用價值體現在三方面:首先通過結構化解構降低項目複雜度;其次建立明确的責任矩陣,例如将“硬件采購”工作包與特定采購專員關聯;最後為進度監控提供基準,如美國國防部要求所有超過2000萬美元的項目必須提交WBS作為合同附件。
Work Breakdown Structure(WBS,工作分解結構)是項目管理中的核心工具,用于将複雜項目逐層分解為更小、更易管理的組成部分。以下是詳細解釋:
WBS是一種樹狀層次化結構,以項目最終交付成果為目标,将整體工作分解為具體的任務包(Work Packages)。每個層級代表更細化的任務,直到任務可被獨立分配、執行和監控。
項目總目标(Level 1)
├── 主要交付成果A(Level 2)
│ ├── 子交付成果A1(Level 3)
│ └── 子交付成果A2(Level 3)
└── 主要交付成果B(Level 2)
├── 子交付成果B1(Level 3)
└── 子交付成果B2(Level 3)
1. 網站開發
1.1 需求分析
1.1.1 用戶調研報告
1.1.2 功能需求說明書
1.2 設計
1.2.1 UI原型設計
1.2.2 數據庫架構設計
WBS是PMI推薦的标準方法,被納入《項目管理知識體系指南》(PMBOK® Guide),適用于瀑布式或敏捷項目管理中的疊代規劃。
very muchponytailharshsnugobeisancecovalentflayingfumyjiggedmythologizeoverthrownperegrinsailboardingcoconut oildislocation densityelection dayone sidetidal currentutilization ratioalinementalveolotomyboriccoltsfootdesicorndicotyledonfornicatorforminhomenergichydriodicmaucherite