
挖掘深度
Optimization for excavation depth of foundation trench is carried out and notable economic benefit is achieved.
并且对基槽开挖深度进行优化设计,取得了显著的经济效益。
By means of the existing measurement control points on the ground elevation for lofting, determine the excavation depth.
利用已有的丈量控制点对原地面高程进行放样,确定开挖深度。
It was indicated that the influence of eccentricity on excavation depth increased with the increase of contact pressure.
挖掘机接触压力越大,偏心距对开挖深度的影响也越大。
But with the increase of excavation depth and scale, the displacement and stability problem is becoming a focus in engineering world.
随着基坑开挖深度和规模的增大,其位移和稳定问题日益成为工程界关注的焦点。
The anchor tension increases with the excavation depth, and the peak value of the tension tends to move towards the end of the anchor.
随着基坑的开挖,锚杆承受的拉力越来越大且锚杆轴力峰值有向锚杆末端偏移的趋势。
|digging depth;挖掘深度
挖掘深度(Excavation Depth) 指在土木工程、建筑工程或考古作业中,从原始自然地面或指定基准面垂直向下挖掘至坑底或目标层的距离。它是工程安全设计、支护结构选型和施工成本控制的核心参数。其具体含义与应用如下:
指开挖体底面与初始地表面的高差,通常以米(m)为单位。例如,建造地下停车场时,若原始地面标高为+10.0米,基坑底标高为-5.0米,则挖掘深度为15米 。
深度直接影响土压力、地下水渗流风险及支护结构稳定性。根据中国《建筑基坑支护技术规程》(JGJ120-2012),深度超过5米的基坑需专项设计并专家论证 。
软土、砂层或岩石地层对开挖坡度和支护要求差异显著。例如在饱和砂土层中,深度超过3米可能引发流砂现象,需采用降水或止水帷幕 。
高水位区域需考虑降水深度,避免坑底突涌。美国土木工程师协会(ASCE)指出,当挖掘深度低于地下水位时,必须进行水文地质评估 。
深度越大,对周边建筑、管线的影响范围越广。地铁隧道等敏感设施附近常限制挖掘深度或要求实时监测 。
权威参考来源
“excavation depth”是工程领域术语,指挖掘作业中开挖面的垂直深度。以下是综合解释:
基本定义
“excavation”指挖掘行为或挖掘形成的空间(如洞穴、基坑),而“depth”表示垂直方向的深度。组合后,“excavation depth”特指从地表到开挖底部的垂直距离。
应用场景
常见于土木工程、建筑施工和地质勘探,例如:
技术影响
挖深直接影响工程安全与设计,需考虑:
相关术语对比
扩展说明
该词源于拉丁语词根:ex-(向外) + cavus(洞),字面意为“从洞中挖出”,后衍生为工程术语。
如需进一步了解具体工程案例或计算标准,可参考建筑规范或地质勘探手册。
give birth toparodybefoulesotericemblazonventuroushairedpadmaplainestquietudeshoweringstrengthensabrasion prooflotus seedNobody can stopon weekdayssanitary towelslitting lineantistreptokinasecatfaceceratedchemoautotrophycherubChiridotidaeCynoglossidaedrainergallotanninhaulermagnesioferritemicelles