
超载预压法
Then the theory can be used to analyze the vacuum surcharge preloading depths and characteristics.
然后运用此理论对真空预压有效加固深度及加固特性进行分析。
Soft subsoil at the back storage yard was treated by vacuum combined with water surcharge preloading.
温州港七里港区后方堆场软基采用真空加水载联合加固处理。
Vacuum combined with surcharge preloading is a good method to reinforce soft foundation at bridge-head.
真空联合堆载预压法是一种较好的桥头软基处理方法。
Surcharge preloading combined with vacuum preloading is an effective method for soft soil consolidation.
真空堆载联合预压法是地基处理有效方法之一。
The program can both calculate the vacuum preloading and the surcharge preloading combined with the vacuum preloading.
该程序实现了堆载的施加,既能用于计算单纯的真空预压也能用于真空–堆载联合预压的有限元计算。
指在基础费用之外额外收取的费用,通常因特定条件触发,如支付方式成本(信用卡手续费)、资源紧缺(燃油附加费)、政策调整(关税附加)等。其核心特点是强制性 和非包含性(不包含在原价中)。例如:
权威来源:英国金融行为监管局(FCA)规定,附加费必须透明公示,且不得高于实际成本(来源:FCA《支付服务条例指南》)。
指在正式使用或操作前预先加载资源的行为,分为三类场景:
权威来源:国际标准化组织(ISO)在《地基处理技术规范》(ISO 23469:2022)中定义了预压法施工标准。
特征 | surcharge(附加费) | preloading(预加载) |
---|---|---|
核心目的 | 覆盖额外成本或调节需求 | 提前准备以提升效率/稳定性 |
触发条件 | 外部因素(成本增加、政策变更) | 主动规划(优化性能或流程) |
领域应用 | 金融、消费、物流 | 工程、计算机、供应链 |
注:以上解释综合行业规范及学术定义,具体场景需结合当地法规或技术标准执行。
“surcharge preloading”是土木工程中的专业术语,指地基处理中的超载预压法。其核心原理是通过施加超过设计荷载的临时荷载(即超载),加速地基土体的排水固结,从而提高地基承载力和减少工后沉降。具体解析如下:
【别人正在浏览】