千斤顶桩;顶压桩,顶入桩
This paper introduces the technique about pit-jacked pile and building correction to replace by rising.
本文对坑式静压桩技术和顶升纠偏技术作介绍。
At a jacked pile foundation construction site in Chuangchun, declinometer technique is applied for field monitoring.
结合长春明珠会所静压桩基础施工工程,测斜仪技术应用于现场进行试验。
Based on the research of mechanism of jacked pile, the factors that may affect the end resistance and the shaft resistance are discussed.
本文在研究静压桩沉桩机理的基础上,探讨影响沉桩时桩端阻力和桩侧摩阻力大小的各种因素。
The mainly analysis measure of the jacked pile that influence on the surrounding engineering environment is the cavity expansion theory and the numerical simulation.
静压桩施工对周围环境影响的分析方法,主要有小孔扩张理论和数值模拟的方法。
An appropriate finite element model was given according to the actual process of jacked pile. This model adopted the rational constitutive model of soil and finite deformation theory.
采用合适的土体屈服准则及有限变形理论,通过在桩—土界面设置接触以及在桩顶施加位移荷载建立了符合压桩实际的有限元模型。
在建筑工程领域,"jacked pile"(顶进桩/静压桩)是一种通过液压顶进设备将预制桩体垂直压入地层的深基础施工技术。该技术通过反力装置将液压产生的巨大压力传导至桩体,使桩体克服土壤阻力逐渐贯入持力层。
根据美国土木工程师学会(ASCE)的施工标准,顶进桩施工流程包含三个核心环节:
相较于传统打桩工艺,顶进桩具有以下技术优势:
该技术已成功应用于上海中心大厦桩基工程,项目采用直径600mm的PHC管桩,单桩承载力特征值达3800kN(上海岩土工程勘察设计研究院技术报告)。对于施工质量控制,建议参考《静压桩施工技术规程》(CECS 235)中的垂直度偏差控制指标(≤0.5%桩长)。
“jacked pile”是土木工程领域的专业术语,指通过静力压入法施工的桩基,其核心含义和特点如下:
如需进一步了解施工参数或案例,可参考工程规范或专业文献。