
锚固力;支撑力
The anchorage state and anchorage force are the two main indices that appraise the anchorage properties.
锚杆锚固质量两个主要衡量指标是锚固状态和锚固力。
It is an important part of suspension bridge construction control to calculate the anchorage force of the main cable wire strands.
悬索桥主缆丝股的锚固力的计算是悬索桥施工控制的一项重要内容。
The anchorage force of consolidated anchorage with prestressed bolt is actually the friction resistance between sand and the wall of drill hole.
砂固结预应力锚杆的锚固力是由砂体与锚孔壁之间的摩擦力提供的。
Anchorage zone of pylon, which is a key part of cable-stayed bridge, can pass local concentrated cable force to the tower column safely and uniformly.
索塔·拉索锚固区是斜拉桥中的关键部位,其作用是将拉索的局部集中力安全,均匀地传递到塔柱。
The combination of prestressed anchorage cable and reinforced concrete beam and slab can well transmit the powerful action force of the cable, which can provide strong blocking and protecting force.
预应力锚索与钢筋混凝土梁和板的结合使用,能较好地传递锚索的强大作用力,提供较大的挡护力。
在土木工程与结构工程领域中,"anchorage force"(锚固力)指通过锚固系统施加的力,用于固定结构或材料,防止其因外部荷载(如重力、风荷载、地震力等)发生位移或失稳。这种力通常由锚杆、锚索、地脚螺栓等构件传递至深层稳定岩土或结构中,是确保工程安全的核心要素之一。
锚固力的核心目标是平衡外部荷载产生的拉力或剪力。例如,在悬索桥中,主缆通过锚碇将拉力传递至地基,防止桥面变形;在边坡加固中,锚杆通过锚固力抑制岩土滑动。
锚固力的计算需综合考虑材料强度、岩土特性及安全系数。常用公式为:
$$
F_a = frac{T_u}{gamma}
$$
其中,( F_a )为设计锚固力,( T_u )为极限抗拔力,( gamma )为安全系数(通常取2.0-3.0)。该公式参考《岩土锚固技术规范》(GB 50330-2013)。
锚固力设计需遵循《混凝土结构设计规范》(ACI 318-19)对锚栓抗拉强度的要求,以及欧洲规范EN 1992-4对荷载分项系数的规定。
根据多个权威词典和工程领域的定义,"anchorage force"(锚固力/锚定力)指通过锚固系统将结构或构件固定到基础或其他结构上的力,主要用于抵抗外部荷载或位移。以下是详细解释:
基本定义
Anchorage force是工程中用于描述锚固装置产生的固定力,常见于土木工程、建筑和机械领域。它通过锚栓、锚杆等装置将材料或结构固定于基体(如混凝土、岩石等),以增强稳定性。
应用场景
相关术语
技术指标
锚固力的计算需考虑材料强度、锚固方式及荷载类型,通常需满足安全系数要求。例如,在混凝土结构中,锚固力需大于钢筋的极限抗拉力。
如需进一步了解具体工程案例或公式推导,可参考结构力学或锚固技术相关文献。
【别人正在浏览】